Black Dog 5m Long Lead
$33.30 – $37.50Price range: $33.30 through $37.50
The perfect 3m lead for scent work, or beach days!
5m Long Lead
These gorgeous colourful 5m Long Leads come in 2 widths – Mini (12mm) and Regular (20mm).
Complete with snap hook and handle, the 5m long lead is ideal for training dogs and puppies for recall or allowing your dog more freedom to roam at the park, or the beach, while still maintaining lead control.
An excellent light weight 5m long lead available in 7 colours: Blue, Red, Green, Pink, Purple, Orange and Black.
Sizes:
Mini: 12mm wide webbing, small snaphook.
Regular: 20mm wide webbing, regular snaphook.
| Weight | N/A |
|---|---|
| Colour | Blue, Red, Green, Pink, Purple, Orange, Black |
| Width | Mini – 12mm, Regular – 20mm |
Only logged in customers who have purchased this product may leave a review.
Related products
Anipal Billy the Bilby Dog Collar
Anipal Great Barrier Reef Dog Collar
Dog Copenhagen Urban Style™ Collar
The Urban Style™ collar from DOG Copenhagen is an easy to use everyday collar made of soft and durable nylon webbing with reflective trim.
Please contact us for an estimated order time before placing this product on backorder. Orders are only placed with Dog Copenhagen a few times a year.
Foobler Puzzle Feeder
JW Hol-ee Roller
Hol-ee Roller, made for fun! The original JW Hol-ee Roller is cleverly designed to be used in so many ways!
Lycra Agility Tug
These Lycra Agility Tug toys are super stretchy and come in a variety of designs and bright colours. Easy to

Reviews
There are no reviews yet.