Black Dog 5m Long Lead
$33.30 – $37.50Price range: $33.30 through $37.50
The perfect 3m lead for scent work, or beach days!
5m Long Lead
These gorgeous colourful 5m Long Leads come in 2 widths – Mini (12mm) and Regular (20mm).
Complete with snap hook and handle, the 5m long lead is ideal for training dogs and puppies for recall or allowing your dog more freedom to roam at the park, or the beach, while still maintaining lead control.
An excellent light weight 5m long lead available in 7 colours: Blue, Red, Green, Pink, Purple, Orange and Black.
Sizes:
Mini: 12mm wide webbing, small snaphook.
Regular: 20mm wide webbing, regular snaphook.
| Weight | N/A |
|---|---|
| Colour | Blue, Red, Green, Pink, Purple, Orange, Black |
| Width | Mini – 12mm, Regular – 20mm |
Only logged in customers who have purchased this product may leave a review.
Related products
Anipal Billy the Bilby Dog Collar
JW Hol-ee Roller
Hol-ee Roller, made for fun! The original JW Hol-ee Roller is cleverly designed to be used in so many ways!
KONG Safestix
Pawks Anti-slip socks
Puppingtons Pods
More stock arriving on Tuesday 21 October!
Loads of new colours and styles, and restocking classic favourites!
Puppingtons Popit Pouch
Puppingtons Popit Pouches – another awesome design by Puppingtons A small discreet but pretty pouch designed for when you just want to
Simply Seaweed
A natural and easy way to look after your dog or cat’s dental health. Certified organic, with no additives, colourings, or preservatives.

Reviews
There are no reviews yet.