Black Dog 5m Long Lead
$33.30 – $37.50Price range: $33.30 through $37.50
The perfect 3m lead for scent work, or beach days!
5m Long Lead
These gorgeous colourful 5m Long Leads come in 2 widths – Mini (12mm) and Regular (20mm).
Complete with snap hook and handle, the 5m long lead is ideal for training dogs and puppies for recall or allowing your dog more freedom to roam at the park, or the beach, while still maintaining lead control.
An excellent light weight 5m long lead available in 7 colours: Blue, Red, Green, Pink, Purple, Orange and Black.
Sizes:
Mini: 12mm wide webbing, small snaphook.
Regular: 20mm wide webbing, regular snaphook.
| Weight | 0.2 kg |
|---|---|
| Colour | Blue, Red, Green, Pink, Purple, Orange, Black |
| Width | Mini – 12mm, Regular – 20mm |
Only logged in customers who have purchased this product may leave a review.
Related products
Anipal Billy the Bilby Dog Collar
Anipal Kylo the Koala Dog Collar
Dog Copenhagen Urban Style™ Collar
The Urban Style™ collar from DOG Copenhagen is an easy to use everyday collar made of soft and durable nylon webbing with reflective trim.
Dog Copenhagen Urban Rope™ Leash
A 160cm lightweight and comfortable everyday leash made from soft and durable nylon rope with a neoprene padded handle, accessory D-ring, reflective trim and lightweight aluminium carabiner with locking option.
Backorder Item
This item is not part of our regular stock and is available by backorder only. Please allow additional time for ordering and delivery.
Pawks Anti-slip socks
PerusPomppa Warm Jacket
Follow us on Facebook to find out when orders open - Pomppa stock is only ordered a few times a year.
PLEASE NOTE: This is NOT the new design with the harness opening.
Puppingtons Popit Pouch
Puppingtons Popit Pouches – another awesome design by Puppingtons A small discreet but pretty pouch designed for when you just want to

Reviews
There are no reviews yet.